Case study: 98000 m³/h of fresh air for ‘Neuman Aluminium’ employees

In this case study, you will read about:

  • Challenges for Neuman: The metal extrusion production process led to high temperatures and created uncomfortable working conditions;
  • After extensive analysis of cooling solutions, it was found that alternative technologies either didn’t provide adequate cooling or relied on energy-intensive compression refrigeration systems;
  • Oxycom’s two-stage evaporative cooling solution through partner INFRANORM® provided a comprehensive and sustainable solution for year-round conditioning of the production halls.

Download the case study by filling out the form.

Download case study