In this case study, you will read:
- The challenges PERFECT - Van Wamel faced, such as high temperatures, high concentration of welding fumes and high energy costs;
- How Oxycom provided PERFECT - Van Wamel with an all-in-one solution for cooling, clean air and cost savings;
- How these solutions can apply to your production facility.
Download the case study by filling out the form.